Minnesota Roofing Code and Permit Checklist

Before an asphalt roof replacement, get three things clear: who handles the permit, what work is included, and how the finished project will be documented. Those answers belong in your planning conversation, not in a last-minute discussion after tear-off.

This checklist is for Minnesota homeowners comparing residential asphalt reroofing proposals. It is a planning guide, not installation instructions or a determination that a particular roof meets code. Confirm project-specific requirements with the building department serving your address.

State rules and linked city resources checked November 1, 2026.

Start with Minnesota's adopted code

Minnesota incorporates the 2018 International Residential Code with Minnesota qualifications and amendments. A general roofing article from another state, or a newer model-code edition, may not describe the rules that apply here. Start with Minnesota's residential code adoption rule, then confirm the requirements for your project.

When reviewing a proposal, ask the contractor to separate three categories:

  • Code requirements: Identify the applicable rule behind work described as required by code.
  • Manufacturer instructions: Identify the exact shingle and accessory products, with the instructions for that system.
  • Optional proposal choices: Label selections or upgrades that are optional for your project, rather than presenting every line item as a code requirement.

Ask for clarification whenever the reason for a recommendation is unclear. Keep the answers with the proposal so you can compare the same scope across contractors.

Your pre-project roofing checklist

1. Confirm the permit and who is responsible

Minnesota's permit rule requires the owner or authorized agent to apply for and obtain the required permit before regulated work begins. Everyone performing applicable work must comply with code; the permit holder is responsible for the work's code compliance. Minnesota Rules 1300.0120, subparts 1 and 14

Ask:

  • Who will apply, and whose name will be on the permit?
  • Is the permit fee included in the proposal?
  • Who will confirm the permit is issued before work starts?
  • Who will arrange inspections and respond to any correction requests?

2. Put tear-off and decking decisions in writing

Ask whether the proposal includes removing the existing roofing or proposes installing over it. If an overlay is proposed, ask the contractor and building official to confirm whether it is appropriate and permitted for this roof.

Minnesota's asphalt-shingle amendment allows attachment to solidly sheathed decks or 1-inch nominal wood boards. It does not establish that every board deck needs an OSB overlay. Minnesota Rules 1309.0905, subpart 1

Ask how the existing deck will be evaluated, what conditions would trigger repair or replacement, and which requirements support that decision. Agree on how any additional work will be documented and approved before tear-off.

3. Review flashing at walls and openings

Minnesota requires flashing at roof-to-wall intersections, changes in roof slope or direction, and roof openings. Ask the contractor to identify these locations on your home and explain what will be replaced, retained, or modified. Minnesota Rules 1309.0903

For existing buildings, kick-out flashing has a specific distinction: this section requires it when re-siding, or when re-siding and reroofing together, but includes an exception for reroofing alone. Confirm the scope if siding work is also planned. Avoid treating the reroof-only exception as a reason to skip a discussion about water management. Minnesota's kick-out flashing provision

4. Ask for the complete roof-system scope

A shingle brand and color do not describe the whole project. Ask the proposal to address:

  • Where ice-barrier membrane and other underlayment will go.
  • How valleys, roof edges, and drip edge will be handled.
  • Whether any roof sections need a different approach because of their slope.
  • How existing intake and exhaust ventilation will be assessed.
  • Which installation instructions apply to the selected products.

For each item, ask whether the approach comes from an applicable code provision, manufacturer instructions, or a project recommendation. Have the contractor explain the answer for your roof rather than relying on a generic package description.

5. Plan inspections before work is covered

The building official identifies the required inspections. Permitted work must remain accessible and exposed for inspection until approved, and work cannot proceed beyond a designated inspection stage without approval. Confirm the sequence before installation; do not assume every city uses the same tear-off and final-inspection process. Minnesota Rules 1300.0210, subparts 1, 3 and 5

Ask which photographs or other records the department needs, and who will collect and submit them.

Local starting points include:

  • Burnsville: The city's permit page requires ice-and-water-barrier photos before a roof project can be inspected, with submission by email or delivery to City Hall. Burnsville roofing permits
  • Prior Lake: The city provides electronic permit application information and lists email or phone scheduling for inspections, including reroofing. Prior Lake Building Inspections
  • Shakopee: The city lists reroofing among projects requiring permits and directs applicants to its ePortal for permit applications and inspection scheduling. Shakopee Building Inspections

Use the department serving your property, even if your contractor works in several neighboring cities.

6. Keep a project record

Minnesota requires the permit or a copy on site through completion and construction permits posted where they are conspicuous and accessible. Minnesota Rules 1300.0120, subpart 13

Keep your signed scope, approved changes, product information, installation photos, inspection results, and any warranty documents together. Before considering the paperwork finished, ask whether any inspection corrections remain open and request the available completion record.

Minnesota roofing permit FAQ

Does a small roof repair need a permit?

Minnesota exempts ordinary repairs from application or notice, but excludes specified structural work and work affecting public health or general safety. Ask your building department how it classifies the proposed repair; do not assume that a small area automatically qualifies. Minnesota Rules 1300.0120, subpart 6

Does every roofing upgrade come from code?

Ask for the basis of each recommendation. Have the contractor identify the code provision, product instruction, or optional choice. A proposal is easier to evaluate when those distinctions are explicit.

Where can I review other roof-planning questions?

For proposal comparisons, repair decisions, and product selection, see our guides to Twin Cities roof replacement costs, roof repair, and Malarkey versus Owens Corning shingles.

Plan your roof project with clear questions

Bring this checklist to your roofing consultation. Have your address, known leak locations, previous repair information, and any planned siding work ready to discuss.

Explore Foremost Exteriors roofing services and request a roof inspection.